Skip to content

Building calendar

Walk-up rental buildings: the year, month by month

A NYC walk-up rental owes something in most months. January brings the tenant notices, September 1 the HPD registration, December the bedbug report. Once a year, a parapet observation and mold and pest checks. With six or more apartments, a boiler inspection by December 31. Gas piping is due December 31 of the district's year.

This page is for a rental building of 3 to 6 stories with no elevator. Your building's own list depends on its units, boiler, tank, devices and district. Send the address and a person on our team checks city records for it.

The year, month by month

  • Fixed date the city sets the day.
  • Once a year any time in the calendar year.
  • Rolling counted from the building's own last test.
The year, month by month: program, due-date rule, who signs and price, by month
ProgramDue-date ruleWho signsPrice
January
Fixed dateLead paint notice January 1 to 16, with replies by February 15. Window guard notice January 1 to 15. Stove knob cover notice by January 16.The owner sends them.Get a price
May to September
Fixed dateEvery year by September 1. The window opens May 21. Buildings with 3 or more apartments.The owner registers, and the managing agent signs too.Get a price
December
Fixed dateFiled December 1 to 31, covering November 1 to October 31. The HPD registration must be current.The owner files it with HPD.The owner files it. HPD charges nothing.
Fixed dateOnce every four years, by December 31 of the year set by the community district. Districts 4, 6, 8, 9 and 16 are due in 2026; 11, 12, 14, 15 and 17 in 2027.A Licensed Master Plumber inspects and signs. The owner attests in DOB NOW.$709 for 1-5 units, $1,059 for 6-50
Fixed dateEvery calendar year with six or more apartments; 5 or fewer are exempt. A December 31 inspection must reach DOB by January 14.A DOB-licensed qualified installer or an authorized boiler insurance company.$509, $369 each extra boiler
Fixed dateWhere the building has one: inspect and sample January 1 to December 31. The report reaches the Health Department by January 15.A licensed master plumber, someone working under one, or a licensed engineer or architect.Get a price
Any time in the year
Once a yearWhere a parapet faces a street or sidewalk. Nothing is filed; the owner keeps each report six years.A person competent to inspect parapets.$499 for 1-3 stories, $549 for 4-6
Once a yearEvery apartment, every year, and after complaints, in buildings with 3 or more apartments.The owner inspects. With 10 or more units, more than 10 square feet of mold needs a NYS-licensed mold assessor.Get a price for a licensed mold assessment
RollingEvery 12 months from the device's last test, where the building has a device.A New York State-certified tester fills out the form, and a Licensed Master Plumber signs it.$249, $99 each extra device
Request an inspection Check my building

No payment now. We confirm the price, the firm and the date with you first.

Not every year

  • Lead paint testing. Pre-1960 rental apartments and common areas need one XRF (x-ray fluorescence) test by an EPA-certified inspector independent of the owner. The August 9, 2025 deadline has passed. Lead paint testing
  • Natural gas detectors. Required from January 1, 2027 in apartment buildings with gas piping. Detectors
  • Taller than six stories? The building also owes a facade inspection every five years. Facades

Steps that stay with the owner

  • Gas piping attestation. The owner creates a DOB NOW account, attests and pays DOB's filing fee. The plumber cannot attest for the owner.
  • HPD registration. The managing agent signs it too, and changes are filed within 5 days. An unregistered owner cannot certify HPD violations or request a dismissal.
  • Bedbug receipt. After filing, the owner gives tenants the receipt with each new lease and renewal, or posts it in the building.
  • Notice replies. If a tenant does not answer by February 15, the owner inspects. Units that cannot be reached by March 1 are reported to the Health Department.
  • Heat. From October 1 to May 31, at least 68 degrees inside from 6am to 10pm when it is below 55 outside, and at least 62 overnight. Hot water at 120 degrees all year.
  • Records. Parapet reports at least six years, tank results at least five, lead testing records at least ten.

We help prepare the paperwork for these steps, tell the owner what to do and when, and send any receipt we receive. We never ask for, hold or use an owner's agency login. What owners keep

Other building types

Check a building

Questions

What does a NYC rental building owner have to file every year?

The HPD registration by September 1 and the bedbug report in December. The boiler report with six or more apartments, and the tank report where there is a tank, also reach the city each year. The parapet report is kept, not filed.

Does a 4-unit walk-up need a yearly boiler inspection?

No. Residential buildings with 5 families or fewer are exempt from the yearly boiler inspection. Six or more need it every calendar year.

Which dates are rolling?

The backflow test is counted from the device's last test. Gas piping follows the community district's year, and the HPD, bedbug, boiler and tank dates are the same every year.

Request an inspection

No payment now. We confirm the price, the firm and the date with you first.