Building calendar
Co-op buildings: the board's year, month by month
A NYC co-op owes the city a yearly set of inspections. The board registers the building with HPD by September 1. By December 31 come the boiler inspection, each elevator's periodic inspection and CAT1 test, and the tank inspection. Gas piping is due in its district's year. Over 25,000 square feet, energy reports are due May 1.
This page is for a co-op of 3 or more apartments, walk-up or elevator. Your building's own list depends on its size, boiler, elevators, tank, devices and district. Send the address and a person on our team checks city records for it.
The year, month by month
- Fixed date the city sets the day.
- Once a year any time in the calendar year.
- Rolling counted from the building's own last test.
| Program | Due-date rule | Who signs | Price |
|---|---|---|---|
| May | |||
| Fixed date | By May 1, for buildings over 25,000 gross square feet. The grade label goes up within 30 days after October 1. | Entered in ENERGY STAR Portfolio Manager. | Get a price |
| Fixed date | By May 1, for most buildings over 25,000 square feet. | A registered design professional certifies it. | Get a price |
| May to September | |||
| Fixed date | Every year by September 1. The window opens May 21. | The board registers the building, not the unit owners. The managing agent signs too. | Get a price |
| December | |||
| Fixed date | Once every four years, by December 31 of the year set by the community district. Piping inside apartments is exempt. | A Licensed Master Plumber inspects and signs. The owner attests in DOB NOW. | $709 for 1-5 units, $1,059 for 6-50 |
| Fixed date | Every calendar year with six or more apartments. A December 31 inspection must reach DOB by January 14. | A DOB-licensed qualified installer or an authorized boiler insurance company. | $509, $369 each extra boiler |
| Fixed date | Each elevator twice a year, at least three months apart, by December 31. DOB refuses prior-year periodic reports after January 14 and CAT1 (category 1 no-load test) reports after January 21. | An approved elevator agency that does not maintain the elevator. | Get a price |
| Fixed date | Where the building has one: inspect and sample January 1 to December 31. The report reaches the Health Department by January 15. | A licensed master plumber, someone working under one, or a licensed engineer or architect. | Get a price |
| Any time in the year | |||
| Once a year | Where a parapet faces a street or sidewalk. Nothing is filed; the owner keeps each report six years. | A person competent to inspect parapets. | $499 for 1-3 stories, $549 for 4-6 |
| Rolling | |||
| Rolling | Every 12 months from the device's last test, where the building has a device. Buildings with roof tanks are on DEP's list. | A New York State-certified tester fills out the form, and a Licensed Master Plumber signs it. | $249, $99 each extra device |
No payment now. We confirm the price, the firm and the date with you first.
Not every year
- Elevator CAT5 and CAT3. A CAT5 full-load test within 5 years of the last one. Hydraulic elevators add a CAT3 every three years. Elevator tests
- Facades. Over six stories, a facade inspection every five years. Facades
- Lead paint testing. Rented co-op units must be XRF-tested; owner-occupied units need not be. All common areas must be. Lead paint testing
- Natural gas detectors. Required from January 1, 2027 in apartment buildings with gas piping. Detectors
Steps that stay with the owner or the board
- HPD registration. The board registers the building, not each unit owner. The managing agent signs too, and changes are filed within 5 days.
- Gas piping attestation. The owner creates a DOB NOW account, attests and pays DOB's filing fee. The plumber cannot attest for the owner.
- Elevators. The owner, not DOB, arranges the periodic inspections and keeps a maintenance log for each device on site.
- Backflow devices. The owner installs and maintains them, not the tenants.
- Mold violations. Only the owner, the managing agent, an officer of the owning corporation or another responsible party on the registration may certify one.
- Records. Parapet reports at least six years, tank results at least five.
We help prepare the paperwork for these steps, tell the board what to do and when, and send any receipt we receive. We never ask for, hold or use an owner's agency login. What owners and boards keep
Other building types
Check a building
Questions
What compliance does a NYC co-op board need to track?
The HPD registration, which the board files for the building by September 1. Then the yearly boiler, elevator, tank and parapet cycles, gas piping in the district's year, and May 1 energy reports for buildings over 25,000 square feet.
Do co-op shareholders register their apartments with HPD?
No. Co-op and condo boards register the building; individual unit owners do not.
Does the gas piping inspection go inside the apartments?
No. Gas piping and appliances inside apartments are exempt from the inspection.
No payment now. We confirm the price, the firm and the date with you first.