NYC building deadlines
The NYC building compliance calendar
Most NYC building deadlines land in January, May and the last weeks of the year. January closes last year's elevator, boiler and tank filings and opens the tenant notices. May 1 is the energy reporting date, September 1 is HPD registration, November 1 is cooling tower certification, and December 31 ends the yearly cycles. FDNY's 5-year tests run from each building's own last test.
January
- January 1, 2027 (one time): natural gas detectors in apartment buildings and hotels with gas piping. Single-plunger brake upgrade on existing traction elevators (both).
- January 1 to 15: window guard annual notice to every tenant (residential).
- January 1 to 16: lead paint annual notice and stove knob cover notice (residential).
- January 14: last day DOB accepts a prior-year periodic elevator report, per device; a boiler inspected December 31 must be filed by this date (both).
- January 15: prior-year drinking-water tank reports to the Health Department (both).
- January 21: last day DOB accepts a prior-year elevator CAT1 report, per device (both).
February and March
- February: DOB publishes the year's covered buildings list for the energy laws (both).
- February 15: tenant replies to the lead paint and window guard notices; the owner inspects units that don't answer (residential).
- March 1: window guard units the owner could not get into are reported to the Health Department (residential).
May
- May 1: LL84 energy and water benchmarking, and the Local Law 97 emissions report (both).
- May 21: HPD registration window opens (residential).
- May 31: heat season ends (residential).
June to August
- June 30 and August 29, 2026: DOB took 2026 LL97 reports until June 30; owners who applied by June 30 could extend to August 29 (both).
September
- September 1: HPD property registration deadline (residential).
October
- October 1: heat season starts (residential).
- Within 30 days after October 1: post the energy grade label near each public entrance (both).
- October 31: the bedbug reporting year ends (residential).
November
- November 1: cooling tower annual certification, for every tower operated that year (both).
December
- December 1 to 31: HPD bedbug annual report (residential).
- December 31: gas piping for the 2026 community districts. Find your district's year.
- December 31: drinking-water tank inspection, the boiler cycle, and each elevator's periodic inspection and CAT1 test (both).
- December 31: LL87 energy audit report for buildings whose tax block ends in the year's last digit; for 2026, blocks ending in 6 (both).
Every few years
- Gas piping (LL152): every 4 years by community district.
- Elevator CAT5: within 5 years of the last one; hydraulic elevators add a CAT3 every 3 years.
- Facades (FISP): every 5 years for buildings over 6 stories.
- Retaining walls (LL37): every 5 years, by borough.
- Parking structures (LL126): every 6 years, by community district.
- Energy audits (LL87): every 10 years, by the last digit of the tax block.
Rolling: dates set by your building's last test
- Standpipe 5-year test: a hydrostatic pressure test and a flow test at least once every 5 years.
- Fire department connections: a hydrostatic test at least once every 5 years, for sprinkler and standpipe connections.
- Fire alarm 5-year retest: every five years from the date the system was accepted.
- Backflow test: every 12 months from the device's last test.
- Cooling towers: a compliance inspection at least every 90 days, and Legionella culture tests at least monthly, no more than 31 days apart, while the tower runs.
FDNY lists 40 to 60 business days for sprinkler and standpipe test requests and 40 to 70 for a fire alarm inspection request, so the 5-year tests need booking months ahead. We don't promise a deadline; tell us the date you’re working toward.
Questions
What NYC building compliance deadlines are coming up?
From late November: the HPD bedbug report in December, the December 31 close of gas piping, tank, boiler, elevator and LL87 cycles, two new rules on January 1, 2027, and the January notices and filing cut-offs. The tracker shows every citywide date in the next 90 days.