NYC building deadlines
NYC building deadlines in December
December 31 closes most yearly cycles in NYC: gas piping for the 2026 community districts, the drinking-water tank inspection, LL87 energy audits for buildings whose tax block ends in the year's last digit, and the boiler and elevator inspection year. Rental owners file the HPD bedbug report between December 1 and 31.
December 1 to 31: the bedbug report (residential)
Owners of rental buildings file the yearly bedbug report with HPD between December 1 and 31, covering November 1 to October 31. HPD charges nothing for the filing and warns about companies asking for large fees. The report can only be filed while HPD registration is current.
December 31: gas piping for the 2026 districts (both)
In 2026 that means community districts 4, 6, 8, 9 and 16, with 68,620 properties on DOB's list. In 2027 it is districts 11, 12, 14, 15 and 17. The scope reaches gas appliances in commercial spaces.
A building that can't finish can request the one-time 180-day extension, which costs $35 and must be filed by December 31. Districts due in 2026.
December 31: drinking-water tanks (both)
The yearly tank inspection and bacteriological sample must happen between January 1 and December 31; the report follows by January 15. Each tank is sampled separately, even when tanks are connected. Water tank inspection: $1,159.
December 31: LL87 energy audits (large buildings)
Buildings over 50,000 square feet file an energy audit and retro-commissioning report every ten years, in the year whose last digit matches the last digit of the tax block. For 2026 that is blocks ending in 6, with the report due December 31, 2026. The 2026 covered list names 16,755 properties under LL87 across all ten years. LL87 audits.
December 31: the boiler and elevator year (both)
Boiler inspections and elevator CAT1 tests run January 1 to December 31. Each elevator owes a periodic inspection and a CAT1 test in the year. The reports can still be filed in January, but the work has to be done by December 31.
Booking in December
- Elevators: a periodic inspection needs three months' spacing from the device's last CAT1, so a late CAT1 can block a December periodic. Get a price.
- Gas piping: book the plumber in the first week; if access to a store or restaurant kitchen can't be arranged, file the extension request before December 31.
- Boilers and tanks: an inspection on December 31 still counts, but its report must reach the agency by mid-January.
We don't promise a deadline. In December, tell us the date you’re working toward; if no licensed firm can take the job, nothing is charged.
Questions
What NYC building deadlines fall in December?
The HPD bedbug report is filed December 1 to 31. December 31 is the last day for the 2026 gas piping districts, the drinking-water tank inspection, LL87 reports for the 2026 block digit, and the boiler and elevator inspection year.