Skip to content

NYC building deadlines

Gas piping due Dec 31, 2026: districts 4, 6, 8, 9 and 16

Buildings in community districts 4, 6, 8, 9 and 16 must have their gas piping inspected by a Licensed Master Plumber between January 1 and December 31, 2026. The certification then goes to DOB within 60 days of the inspection. If the inspection can't happen in time, a one-time 180-day extension must be requested by December 31.

Which buildings

DOB's LL152 list puts 68,620 properties in this group. By borough:

  • Manhattan: 12,708 properties. By district: 4 (3,426), 6 (2,563), 8 (4,609), 9 (2,110). With an open gas piping violation on record: 2,537.
  • Bronx: 11,784 properties. By district: 4 (2,415), 6 (2,637), 8 (1,543), 9 (5,189). With an open gas piping violation on record: 5,318.
  • Brooklyn: 25,442 properties. By district: 4 (6,520), 6 (8,089), 8 (4,584), 9 (2,388), 16 (3,861). With an open gas piping violation on record: 9,967.
  • Queens: 18,686 properties. By district: 4 (6,966), 6 (1,731), 8 (5,127), 9 (4,862). With an open gas piping violation on record: 8,244.

District 16 exists only in Brooklyn, and Staten Island has no district in this group. Open-violation counts are buildings with a gas piping failure-to-file violation still open on public city records, mostly from the first cycle; counted November 19, 2026.

What to do before December 31

  1. Book a Licensed Master Plumber. The plumber inspects every exposed gas line in common areas, including commercial spaces since Local Law 142 of 2025. Apartments are exempt.
  2. Set up the owner's DOB NOW account. The owner must create it, attest and pay DOB's filing fee. Nobody else can attest for them, including the plumber.
  3. Plan for repairs. If the plumber finds conditions to fix, the corrected certification is due within 120 days of the inspection. Unsafe conditions are reported at once to you, the gas utility and DOB.

Stores and restaurants before December 31

The inspection now runs to the connection of each gas appliance, and that includes exposed piping and appliances in commercial spaces. In a mixed-use building the plumber needs into the ground-floor restaurant kitchen and any store with gas equipment. Ask commercial tenants for access dates this week. If a tenant can't open up before December 31, that is the case for filing the extension.

Buildings with 51 or more units, and commercial buildings with many gas points, are priced after a site survey: Get a price.

If you can't make it

Request the one-time 180-day extension in DOB NOW before December 31. It costs $35. If the certification is filed and accepted inside the extension, DOB issues no violation.

What happens if you miss it

The penalty for not filing is $5,000, or $1,500 for a 3-family building. There are no late fees on top; DOB charges the full penalty once. Public city records show violations for missed 2025 filings issued from January 2026, so owners who miss 2026 should expect notices in early 2027.

Questions

Is my building in this group?

If DOB's list puts it in sub-cycle C, yes. Check the address on our look-up, which shows the district, the sub-cycle and any open gas piping violation.

We have two buildings on one lot. One filing or two?

Two. Each building with its own BIN is filed separately.

When is gas piping due for Districts 4, 6, 8, 9, 16 (2026, next 2030)?

The current cycle runs January 1 to December 31, 2026, and the next one is January 1 to December 31, 2030. A building that files the 180-day extension by December 31 gets extra time for this cycle only.