NYC building deadlines
NYC building deadlines in January
January has seven dated NYC building deadlines. Three are tenant notices due in the first half of the month. Four close out last year's work: DOB refuses prior-year periodic elevator reports after January 14 and CAT1 reports after January 21, a boiler inspected on December 31 must be filed by January 14, and tank reports reach the Health Department by January 15.
The seven dates
- January 1 to 15, window guard notice (residential). Every tenant or occupant gets the annual notice form.
- January 1 to 16, lead paint notice (residential). Delivered to each tenant in multiple dwellings built before 1960 or between 1960 and 1978.
- By January 16, stove knob cover notice (residential). The annual notice goes to tenants on or before this date.
- January 14, periodic elevator reports (residential and commercial). The last day DOB accepts last year's periodic inspection report. After that it refuses the filing and issues a failure-to-file violation, per elevator.
- January 14, December boiler reports (both). Reports are due 14 days after the inspection, so a boiler inspected on December 31 must reach DOB by January 14. This covers buildings with six or more families, commercial and mixed-use buildings.
- January 15, drinking-water tank reports (both). The certified tank inspector submits last year's report to the Health Department.
- January 21, CAT1 elevator reports (residential and commercial). The last day DOB accepts last year's CAT1 report; later filings are refused and become violations.
Two one-time deadlines on January 1, 2027
- Natural gas detectors. Required from January 1, 2027 in buildings with gas piping. The rule covers R-1, R-2 and R-3 occupancies: apartment buildings and hotels, but not offices or stores. Detector rules.
- Single-plunger elevator brakes. Existing traction elevators with single-plunger brakes must meet DOB's upgrade requirement by January 1, 2027. Your elevator maintenance company can tell you which of your machines have them. Elevator rules.
January dates are filing cut-offs
The elevator, boiler and tank dates in January only accept paperwork for work already done. Elevator and boiler inspections run on the calendar year, and the tank inspection and sample fall between January 1 and December 31. An inspection booked in January counts for the new year and leaves last year's line open.
For commercial buildings the count is per device. A tower with dozens of elevators can owe dozens of periodic and CAT1 reports by these two dates, and each missing one is its own violation.
What to book ahead, and when
- By early December: open elevator lines. A periodic inspection must be at least three months from the device's last CAT1 test, so an elevator whose CAT1 ran in October can't take its periodic before the year ends. Check the spacing in the autumn.
- By mid-December: boilers and tanks. Book any boiler or tank still open for the year early enough that the report can be filed by the January date.
- Before the holidays: notice mailings. The notice windows open January 1 and close within about two weeks, so print and address the forms in December.
| Line | Price |
|---|---|
| Drinking-water tank inspection | $1,159 |
| Low-pressure boiler inspection | $509 |
| Elevator periodic inspection, per device | Get a price |
| Elevator CAT1 witness, per device | Get a price |
We don't promise a deadline. Tell us the dates you’re working toward, and if no licensed firm can take the job, nothing is charged.
Hubs for January's programs
Questions
What NYC building deadlines fall in January?
Seven dated items: the window guard notice (January 1 to 15), the lead paint notice (January 1 to 16), the stove knob notice (by January 16), last year's periodic elevator and late boiler reports (January 14), tank reports (January 15) and last year's CAT1 elevator reports (January 21). In 2027, gas detectors and the elevator brake upgrade are also due January 1.