Inspection program
Fire pump testing in NYC
A NYC fire pump runs a weekly test without flowing water: at least 10 minutes for an electric pump and 30 for a diesel. Once a year each pump assembly is tested at minimum, rated and peak flows. The pump valves, piping and gauges also get a weekly visual check. All of it follows the Fire Code and NFPA 25.
| Line | Price |
|---|---|
| Fire pump annual flow test, per pump | Get a price |
Status: quote. You get a per-pump price before we schedule any work. Towers with several pumps or booster pumps get one building program quote that lists each pump.
Which buildings need it
Any building with a fire pump, booster pump or special service pump. All three are fully tested every year. Pump valves are supervised open by the fire alarm system and monitored by an approved central station.
Who may do the work
Fire pumps are maintained under NFPA 25, and NFPA 25 testing is done by a certificate of fitness holder with the right qualifications. For the annual flow test we book a licensed fire protection contractor whose staff hold the FDNY certificate.
How often
- Weekly: an automatic start without flowing water, electric pumps at least 10 minutes and diesel pumps at least 30.
- Weekly: a visual inspection of the pump valves, piping and gauges.
- Yearly: a flow test of each pump assembly at minimum, rated and peak flows.
A generator set that supplies emergency power to a fire pump is also tested under the emergency power rules. See emergency generator testing.
FDNY requests and fees
FDNY lists 40 to 70 business days for a fire pump test or retest request. FDNY's acceptance test fee for fire and booster pumps is $210 an hour per pump. Records of every test are kept for at least 3 years.
Penalties
A fire protection systems violation is $950 for a first violation and $2,375 for a repeat. An inspection and testing violation is $600 first, $1,500 repeat.
What we coordinate
We coordinate the annual flow test with a licensed contractor and send you the test curve and report. Weekly runs remain a building duty. See the FDNY testing overview.
Questions
How often must a fire pump be tested in NYC?
Weekly without flowing water, at least 10 minutes for electric pumps and 30 for diesel, and yearly at minimum, rated and peak flows.