NYC emergency power systems are inspected and tested under load periodically, following NFPA 110 as the Fire Code modifies it. The city changes the transfer switch exercise from monthly to semiannual. A licensed electrician or licensed stationary engineer supervises the testing. Generators of 40 kW or more are also registered with DEP.

Line Price
Generator annual load-bank test and report Get a price
Emergency light or exit sign 90-minute test, per fixture Get a price

Status: quote for commercial buildings. Request a price per generator or per emergency-lighting fixture. For residential buildings, the emergency-lighting requirements are listed for information.

Get a generator price Emergency light price

Which buildings need it

Any building with an emergency or standby power system. A generator that feeds a fire pump is tested under these same rules.

Who may supervise the test

A person with a listed qualification, such as a DOB-licensed electrician or a licensed stationary engineer. A Fire and Life Safety Director certificate holder may also supervise generator testing. We book a licensed electrician with a load bank for the annual test.

How often

  • Load tests: periodically under load, on the NFPA 110 schedule as modified by the Fire Code.
  • Transfer switches: exercised semiannually; New York City replaces NFPA 110's monthly interval.
  • Records: written records of inspection, testing and maintenance, including transfer switches and storage batteries.

New emergency and standby power installations need special inspections by a registered Special Inspection Agency that the owner engages.

Emergency lighting

  • Monthly: a manual activation test of emergency egress lighting, unless the equipment has an automatic self-test.
  • Yearly: battery emergency lighting run on battery for at least 90 minutes.

We book the yearly 90-minute test per fixture and keep the results by floor.

DEP registration for generators

Emergency and portable generators of 40 kW or more must be registered with DEP. Stationary generators of 450 kW or more need a DEP work permit and a Certificate to Operate, issued for up to three years from inspection.

Questions

How often must emergency generators be tested under load in NYC?

Periodically, on the NFPA 110 schedule as modified by the Fire Code, with written records kept. New York City sets the transfer switch exercise at semiannual instead of monthly.