Inspection program
Close a violation after the work is done
A violation stays open until the city receives proof of a correction. DOB uses a Certificate of Correction through DOB NOW: Safety; HPD uses a certification due by the date on the notice. A qualified firm can prepare and file where the rules permit. We coordinate the request.
| Item | Price |
|---|---|
| DOB Certificate of Correction filing | $439 per violation |
| HPD certification or dismissal request | $439 per violation |
Repairs are never inside these prices. HPD charges nothing to certify a correction; a Dismissal Request reinspection has an HPD fee, passed through at cost.
HPD violations: who must certify
Owners of residential buildings with open HPD violations. HPD mails each notice to the managing agent on the last valid registration, or to the owner if there is none. An owner whose registration isn't current can't certify at all, so we check that first.
When it comes up
Each time HPD issues a violation; there is no fixed cycle. HPD classes each one A (non-hazardous), B (hazardous) or C (immediately hazardous).
HPD correction windows
- Class A: 90 days. Class B: 30 days.
- Class C lead, window guard, mold and pests: 21 days.
- Class C self-closing doors: 14 days.
- Class C heat and hot water: no time to correct.
- Most other Class C: 24 hours.
How HPD certification is filed
On paper with the notice, or through eCertification. Lead, mold and pest violations can't go through eCertification. Properly certified violations are deemed closed 70 days after HPD receives the certification, unless a reinspection finds otherwise.
HPD fees
HPD charges nothing to certify a correction. Violations not certified on time need a Dismissal Request reinspection, which carries an HPD fee.
HPD penalties
Class B runs $75 to $500 plus $25 to $125 a day. For violations issued since December 8, 2023 in buildings over 5 units, Class C runs $150 to $1,200 plus $150 to $1,200 a day. HPD can also fix immediately hazardous conditions through its Emergency Repair Program and bill the property.
If the HPD date passed
File a Dismissal Request; HPD reinspects for a fee. Never certify before the fix: a violation found uncorrected after certification goes into False Certification status, stays open and exposes the owner to penalties.
DOB summonses: who files
Owners with a DOB summons, residential or commercial. DOB's Certificate of Correction route follows the summons, so office, retail and hotel owners file the same way.
When it comes up (DOB)
Each time DOB issues a summons. Violations for a missing inspection report, such as gas piping or elevators, are resolved by filing a current report and paying the penalty; see available inspections.
DOB timing
A Class 1 summons must be corrected immediately.
How the DOB certificate is filed
Through DOB NOW: Safety. The violation stays open on the property's public record until it is dismissed at an OATH hearing or resolved through that review.
DOB penalties
Class 1 summonses at construction sites larger than 4 families that aren't corrected and certified in time face an extra $5,000 DOB civil penalty and re-inspections every 60 days. Not submitting a certificate for an OATH summons may bring more violations.
6,587 DOB violations for a missing Certificate of Correction on an immediately hazardous summons, issued since 2025, were open (public city records, counted November 19, 2026).
Fixing a missed DOB certificate
Correct the condition and file the Certificate of Correction; certifying the summons as corrected avoids that penalty and further re-inspections.
What our fee covers
- Matching each open violation to its cure and the evidence needed.
- Preparing the Certificate of Correction or the HPD certification, with photos, invoices and reports attached.
- Filing it, and tracking it until the record shows it closed.
We don’t argue violations at hearings or coordinate certification for conditions that have not been fixed. See our guide for residential managing agents.
Questions
How do I clear an HPD violation?
Fix the condition, then certify the correction to HPD by the date on the notice, on paper or through eCertification; lead, mold and pest violations go on paper. HPD charges nothing, and a proper certification is deemed closed 70 days after HPD receives it unless a reinspection finds otherwise. Missed the date? File a Dismissal Request.
How do I file a Certificate of Correction with DOB?
Correct the condition, then file the Certificate of Correction through DOB NOW: Safety. The summons stays open on the property's record until that review resolves it or an OATH hearing dismisses it.
What do HPD violation classes A, B and C mean?
A is non-hazardous (90 days to correct), B is hazardous (30 days), and C is immediately hazardous: 21 days for lead, window guards, mold and pests, 14 days for self-closing doors, and 24 hours for most others.
Can I certify an HPD violation myself?
Yes, and HPD doesn't charge for it. Our fee covers preparing the evidence and the filing for owners who'd rather not.