Skip to content

Guide

NYC energy laws compared: LL84, LL33, LL97, LL87, LL88

LL84 is a yearly energy and water benchmark due May 1, and LL33 turns it into a grade label posted each October. LL97 is a yearly emissions report due May 1 with limits and a per-ton penalty. LL87 is an energy audit and retro-commissioning every ten years. LL88 required lighting upgrades and tenant sub-meters by January 1, 2025.

The five side by side

Local Law 84: benchmarking

  • Who is covered: buildings over 25,000 gross square feet, and several buildings on one lot or condominium over 100,000 together.
  • When: every year by May 1.
  • Who submits: the owner, in ENERGY STAR Portfolio Manager, per building.
  • Penalty: $500 for missing May 1, and the grade becomes an F.
  • More: energy benchmarking.

Local Law 33: the grade label

  • Who is covered: buildings covered by Local Law 33.
  • When: posted near each public entrance within 30 days after October 1.
  • Grades: A to D by score, F for no benchmarking, N for exempt.
  • Penalty: $1,250 for not displaying it on time.

Local Law 97: emissions limits

  • Who is covered: buildings over 25,000 gross square feet, among others, and several buildings on one lot or under one condominium board over 50,000 together.
  • When: a report every year by May 1; no penalty if filed within 60 days.
  • Who certifies: a registered design professional.
  • Penalty: floor area times $0.50 a month for not filing; $268 per ton over the limit, per year.
  • More: Local Law 97 report.

Local Law 87: energy audit and retro-commissioning

  • Who is covered: buildings over 50,000 gross square feet, and several buildings on one lot or condominium over 100,000 together.
  • When: every ten years, in the year matching the last digit of the tax block.
  • Who files: a registered design professional.
  • More: energy audit (LL87).

Local Law 88: lighting and sub-metering

  • Who is covered: buildings over 25,000 gross square feet, and several buildings on one lot or condominium over 100,000 together.
  • When: lighting to code and tenant sub-meters by January 1, 2025; a compliance report by May 1, 2026 for buildings that had not yet shown it.
  • Who certifies: a registered design professional or a licensed master or special electrician.
  • Penalty: $1,500 a year for a missing sub-meter report.
  • More: Local Law 88.

How they fit together

The size lines differ. A 30,000-square-foot building falls under LL84, LL88 and LL97 but not LL87, which starts above 50,000. LL84 and LL97 share the May 1 date, so one spring deadline covers both. LL33's grade comes from LL84: no benchmark means an F.

DOB's 2026 Covered Buildings List, published March 2026, is the starting point for every one of them. It holds 28,173 buildings under LL84, 28,501 under LL97, 16,755 under LL87 and 27,341 under LL88.

What we coordinate

LL84 benchmarking is bookable now at $439 per building per year. LL97 reports on commercial buildings are quoted per building (Get a price); residential LL97, LL87 and LL88 are referrals to an engineering firm or licensed electrician, tracked on your calendar. We don't promise a deadline.

Questions

What is the difference between LL84, LL97, LL87 and LL88?

LL84 is a yearly energy and water benchmark due May 1. LL97 is a yearly emissions report due May 1, certified by a registered design professional, with limits and penalties. LL87 is an energy audit and retro-commissioning every ten years for buildings over 50,000 gross square feet. LL88 required lighting upgrades and tenant sub-meters by January 1, 2025.