Guide
FDNY fire safety plan levels, explained
Apartment buildings with three or more units post a fire safety notice on every apartment door. Larger office, store and assembly buildings need a Level 2 fire and emergency preparedness plan. The biggest office buildings, every high-rise hotel and high-rise store buildings need a Level 1 comprehensive fire safety and emergency action plan, run by a certified Fire and Life Safety Director.
Three things people call a fire safety plan
- Apartment door notice: residential buildings with three or more apartments post a fire safety notice inside every apartment door and keep self-closing doors.
- Level 2 plan: the fire and emergency preparedness plan, run by FEP staff. Staff get 1 hour of initial training and, except the FEP coordinator, a 30-minute refresher every quarter.
- Level 1 plan: the comprehensive fire safety and emergency action plan, with a Fire and Life Safety Director present during business hours.
The Fire Code sets three plan levels in all. Any Fire Code plan is reviewed and updated at least once a year.
Thresholds by occupancy
| Building | Plan |
|---|---|
| High-rise or large-area office, more than 500 occupants or more than 100 above or below street level | Level 1 |
| Office with more than 100 people on high-rise floors | Level 1 |
| Other office buildings above the occupant threshold | Level 2 |
| Any high-rise hotel | Level 1 |
| High-rise store building, or more than 300,000 square feet of store space on high-rise floors | Level 1 |
| Store over 30,000 square feet with more than 25 employees | Level 2 |
| Assembly building with 5,000 or more occupants | Level 1 |
| Bar, restaurant or catering hall on a high-rise floor or rooftop | Level 2 |
High-rise means an occupied floor more than 75 feet above fire department vehicle access. Large-area means a building that is not high-rise but has more than 100,000 gross square feet.
Mixed buildings. A building with several occupancies may use one plan, but runs a coordinated drill at least every 2 years.
How each plan is filed
- Level 1: FDNY accepts it before occupancy. The filing includes a signed and sealed letter from a Professional Engineer or Registered Architect. A new filing is $630; amendments are $210 an hour, up to $630. Trained fire safety staff must be in place within 30 days of acceptance.
- Level 2: submitted for FDNY acceptance before occupancy in high-rise and large-area buildings; otherwise kept on the premises for FDNY review.
Drills
- Offices: fire and non-fire drills semiannually for all occupants, and quarterly for two years after a Level 1 plan is accepted.
- Hotels, stores and assembly spaces: semiannually; patrons, guests and visitors need not take part.
- Who runs them: an FLS director, an FEP coordinator or a drill conductor certificate holder. FDNY's F-07 covers drill leaders in buildings that do not require a director.
Drills are recorded in a bound log book or an approved electronic format.
Penalties
FDNY's penalty for an emergency planning violation is $950 for a first violation and $2,250 for a repeat.
Where we fit
We can coordinate Level 1 and Level 2 plan preparation by a licensed design professional, and keep review and drill dates on your calendar. The director, deputies, wardens and FEP staff are the building's own people; see Fire and Life Safety Director and fire safety and emergency plans.
Questions
What is the difference between a fire safety plan, an emergency action plan and a Level 1 plan?
In an apartment building, the fire safety duty is a notice on every apartment door. In larger commercial buildings, Level 2 is the fire and emergency preparedness plan, and Level 1 is the comprehensive fire safety and emergency action plan, the level that requires a Fire and Life Safety Director. Which one applies depends on occupancy and size.