NYC building deadlines
Gas piping in districts 2, 5, 7, 13 and 18: next due 2029
Community districts 2, 5, 7, 13 and 18 were due for gas piping by December 31, 2025, and are next due in 2029. Public city records show failure-to-file violations for missed 2025 filings issued from January 2026. A current inspection clears the record now; otherwise it can wait for 2029.
Which buildings
DOB's LL152 list puts 77,475 properties in this group, the largest of the four. By borough:
- Manhattan: 11,124 properties. By district: 2 (4,186), 5 (2,882), 7 (4,056). With an open gas piping violation on record: 1,659.
- Bronx: 6,535 properties. By district: 2 (2,116), 5 (2,051), 7 (2,368). With an open gas piping violation on record: 2,286.
- Brooklyn: 27,084 properties. By district: 2 (5,222), 5 (7,414), 7 (6,299), 13 (3,206), 18 (4,943). With an open gas piping violation on record: 11,542.
- Queens: 28,837 properties. By district: 2 (5,522), 5 (9,357), 7 (8,898), 13 (5,060). With an open gas piping violation on record: 9,152.
- Staten Island: 3,895 properties. By district: 2 (3,895). With an open gas piping violation on record: 2,193.
District 13 exists only in Brooklyn and Queens, and district 18 only in Brooklyn, so those two boroughs make up most of this group. The open-violation figure for each borough counts buildings whose gas piping failure-to-file violation is still open in public city records, counted November 19, 2026.
Got a 2025 violation?
- The penalty is $5,000, or $1,500 for a 3-family building, paid in one sum with no interest.
- File a current inspection now if you need the record clean for a sale, refinancing or new certificate of occupancy.
Office, retail and hotel buildings in this group
A commercial building that missed 2025 resolves it the same way an apartment building does: a current inspection and certification. On a campus or a lot with several buildings, each building with its own BIN needs its own filing. We quote these after a site survey that counts the gas appliances and tenant spaces: Get a price.
Questions
When is gas piping due for Districts 2, 5, 7, 13, 18 (next 2029)?
Between January 1 and December 31, 2029; the last cycle closed December 31, 2025. A current inspection before 2029 clears a 2025 violation from the record.
Can I get the penalty waived?
We don't handle waivers or hearings. We book the inspection and prepare the filing that resolves the violation; for a waiver, ask DOB or your attorney.
What changed since 2025?
Since July 27, 2026, gas piping certifications are filed in DOB NOW: Safety with a filing fee, and the scope includes commercial spaces under Local Law 142 of 2025.