NYC building deadlines

Gas piping in districts 1, 3 and 10: next due 2028

Community districts 1, 3 and 10 were due for gas piping in 2024 and are next due between January 1 and December 31, 2028. Buildings that missed 2024 can expect a failure-to-file violation on record. It can be cleared now with a current inspection, or the owner can file in 2028.

Which buildings

DOB's LL152 list puts 71,689 properties in this group. By borough:

  • Manhattan: 9,419 properties. By district: 1 (1,531), 3 (4,240), 10 (3,648). With an open gas piping violation on record: 2,590.
  • Bronx: 8,677 properties. By district: 1 (2,717), 3 (2,054), 10 (3,906). With an open gas piping violation on record: 2,222.
  • Brooklyn: 25,069 properties. By district: 1 (11,511), 3 (8,672), 10 (4,886). With an open gas piping violation on record: 5,274.
  • Queens: 20,167 properties. By district: 1 (11,608), 3 (5,727), 10 (2,832). With an open gas piping violation on record: 3,133.
  • Staten Island: 8,357 properties. By district: 1 (5,569), 3 (2,788). With an open gas piping violation on record: 3,714.

This is the only group that includes Staten Island districts 1 and 3. Open-violation counts are buildings with a gas piping failure-to-file violation still open on public city records; counted November 19, 2026.

Missed 2024: file now or wait?

  • File now if you are refinancing, selling, or applying for a new certificate of occupancy, or simply want the violation off the record.
  • Wait for 2028 if none of that applies. The 2028 filing still resolves the violation, and the penalty does not grow with interest in the meantime.
  • Either way, the penalty itself has to be paid: $5,000, or $1,500 for a 3-family building.

A current filing uses today's scope

An inspection filed now to clear a 2024 violation is done to the current rule. Since Local Law 142 of 2025 that runs to the connection of each gas appliance, including exposed piping and appliances in commercial spaces. Owners of mixed-use buildings should plan access to the stores and restaurants as well as the cellar and halls.

For commercial buildings and buildings with 51 or more units, the current filing is quoted after a site survey: Get a price.

Questions

When is gas piping due for Districts 1, 3, 10 (next 2028)?

Between January 1 and December 31, 2028; the previous cycle was 2024. Buildings that missed 2024 can file a current inspection before then to clear the violation.

Does a 2026 inspection count for 2028?

No. Each cycle's inspection has to fall inside that cycle's dates, which for this group are January 1 to December 31, 2028. An inspection now resolves the missed cycle; 2028 still needs its own.

How do I check whether my building has the violation?

Search the address on our look-up. It shows open gas piping violations and the record they come from.